Installed new Stenner Pump Tube yesterday after tear failure.
Water continues at consistent A+.
Check valves likely were important in resolving intermittent problems.

Monday, July 9, 2018

Water conditions have been A+ for two days since installed check valves, performed manual regeneration on all tanks, and corrected that kat2 tank was operating in partial bypass for some time.
Diagnostic record:
Peak Flow
Hours in Service
Volume Used
Reserve Capacity
Volume/Days Remaining
7000sxt Fine Mesh Nelsen resin
PF 4.2; 6.6; x; 4.8
HR 7; 18; x; 11
VU 66; 143; x; 91
RC 317; 317; x; 317
Volume Remaining 1202; 1125; 1175
7000sxt Centaur Carbon
HR 9; 20; 37
Days Remaining 2; 2; x; 1
7000sxt Katalox Light (kat2)
PF 3.2; 6.3; x; 3.7
HR 10; 21; x; 14
VU 192; 268; x; 189
RC 123; 123; x; 123
Volume Remaining 920; 844; x; 912
7000sxt Calcite 
PF 5.7; 7.7; x; 4.3
HR 13; 24; x; 17
VU 590; 686; x; 604
RC 120; 120; x ;120
Volume Remaining 490; 394
5810 Katalox Light (kat1)
PF 4.9; 6.5; x; 5.0
HR 22; 11; x; 15
VU 339; 442; x; 367
RC 120; 120; x; 120
Total Volume 19.7x1000
Volume Remaining 741; 638; x; 712

Note: carbon tank is the only one without a flow meter; tanks appear to all be regenerating after 72 hours other than carbon tank which I'm not sure about

Sunday, July 8, 2018

Due to problems, currently all valves are set with low DO (day override settings).
If water conditions continue to show promise these settings should be increased.
Note as of June 2018 injectors, seals and spacers, and brine valves replaced as needed.
Monitor calcite and kat1 tank for seal degradation due to chlorine.
By January 2019 valves should be checked for leaking down backwash line.
Note: 25” BLFC button is fine for your 40K Softener. The DLFC should be a “200” or “240” button.
Other buttons have not be checked.
7000sxt Calcite 
DF gal
RF dF2b
CT Fd
C 24
H 20
RS SF
SF 10
DO 3
RT 11:00pm
B1 10
BD 0
B2 0
RR 10
BF OFF
5810 Katalox Light (kat1)
DF gal
RF dF2b
CT Fd
C 24
H 20
RS SF
SF 10
DO 3
RT 11:30pm
B1 10
BD 60
B2 5
RR 10
BF 5
7000sxt Katalox Light (kat2)
DF gal
RF dF2b
CT Fd
C 24
H 20
RS SF
SF 10
DO 3
RT 1:10am
B1 10
BD 60
B2 5
RR 10
BF 5
7000sxt Centaur Carbon
DF gal
RF Fltr
CT tc
DO 2
RT 2:50am
BW 10
RR 10
7000sxt Fine Mesh Nelsen resin
DF gal
RF dF2b
CT Fd
C 31 (40 suggested by third party)
H 20
RS SF
SF 20
DO 3
RT 3:20am
B1 10
BD 60
B2 5
RR 10
BF 21
Complete by 5:10am


7000 Calcite  10x44 standard (topped off May 2018)
5810 Katalox Light (kat1) 10x44, Vortech, added April 2017
7000 Katalox Light (kat2) 10x44 Vortech, (media replaced June 2018)
7000 Centaur Carbon 10x44 Vortech (media replaced June 2018)
7000 Fine Mesh Nelsen resin 10x44 Vortech, (media replaced June 2018)
Issues:
Kat 2 operating without distributor
Regeneration times overlapping
Reverse flow may have been occurring from irrigation and/or softener bypass, installed two Valterra 200-C10 PVC Swing/Spring Combination Check Valves
Flow meters:
calcite tank- no flow meter
kat 1 tank- 5810 reads volume (VU), but no no peak flow (PF)
kat 2 tank- shows 3.2 PF, but no VU
carbon- no flow meter
resin- 2.2 PF, but no VU
Condition:
As of July 8, 2018 water clear